Distribution marketing project

WHOLE FAMILY RESIDENTIAL THỊNH




introduction project

The project area is located in Duc Hoa town - Duc Hoa - Long An province, with a total project area: 125,318 m2. M Street intersection at the provincial money 825 (Provincial Highway 10) and Provincial Road 824 (Provincial Highway 9) is about 18km from the center of Ho Chi Minh City, in the fast growing area of industrial and residential - commercial. According to project design will provide 479 ground to meet demand for about 2000 residents, and other facilities necessary public facilities (kindergartens, schools, parks, health ...)
Residential projects Gia Toan Thinh promised a peaceful life and convenience for residents.Where the class is confirmed by all residents living in the project life.

+ There is also arrangement of public facilities such as water supply station, trade and services, waste water treatment area, area schools to cater for public activities. Also, park and green park area culture - sport will serve the spiritual needs of living of local residents.

 
Location


Lands "Residential Gia Toan Thinh extended area of 25 hectares is located adjacent to existing residential Tan Duc, Duc Hoa Ha Commune, Duc Hoa District - Long An province.

Boundary as proposed planned as follows:
+ East: Bounded Tree Ocean Road. 
+ The West: New residential areas bordering Germany, the Provincial Road 824 about 2 km. 
+ South and Southwest: New residential area bordering Germany, the An Ha canal about 2 km. 
+ North: field, the provincial highway 825 about 1.5 km. 
+ North corner of the planning area is located opposite the town of Duc Hoa provincial highway 825. 

The need for investment

The growth of key economic areas generally south of Ho Chi Minh City and in particular not only affect the comprehensive development of its own to the city that will profoundly modified both the local neighborhood : Binh Duong Province to the north (the formation of clusters of urban and industrial areas South Pacific), to the northeast province of Dong Nai, Vung Tau (forming a series of concentrated industrial zones in Dong Nai province and new towns: Nhon Trach, Phu My), and southeast to the southern province of Long An (forming a series of industrial zones in the two districts and Duc Hoa, Ben Luc) ...
Therefore, the Residential Project Gia Toan Thinh (Phase 1) is formed, to meet the requirements for the resettled households in areas cleared of Urban Projects and Business Center Duc Hoa conditions stabilize their lives and benefit the utility that the project brings.
Toan Thinh Gia residential areas (Stage 1) in Duc Hoa district, Long An Province is located adjacent to existing residential Tan Duc. The development of construction planning in the land above have many advantages in transportation, land use and infrastructure to help people settle in quickly.
Besides, the formation of Residential Gia Toan Thinh (Phase I) spacious and fully equipped infrastructure for people's life will contribute to the urban and modern aesthetics in the coastal areas in accordance with the guidelines of the Long An Province.
Payment methods
- Phase 1: Immediately after signing the contract, Party A Party B contributed 15% of the total value of equity, equivalent to ... ... ... ... ... ... .. the same (in words)

- Phase 2: After 03 (three) months from the date of signing the contract, Party A to Party B contributed to 20% of the total value of equity, to conduct land leveling, or ... ... ... ... ... ... .. copper (in words)

- Phase 3: After 02 (two) months after the second round of capital contribution, to Party B to Party A contributed 15% of the total value of equity, the leveling is complete, the equivalent ... ... ... ... ... ... .. copper ( in words)

- Stage 4: After 03 (three) months after the third round of capital contribution, Party B shall contribute capital to 20% of the total value of equity, when construction is complete road and drainage system, equivalent to ... ... ... ... ... ... .. the same (in words)

- Stage 5: After 02 (two) months from the date of capital contribution stage 4, Party A to Party B contributed to 15% of the total value of equity, after the construction is complete electrical system and water supply, air defense systems fire protection, equivalent to ... ... ... ... ... ... .. the same (in words)

- Stage 6: After 02 (two) months after the fifth round of capital contribution, to Party B to Party A contributed 10% of the total value of equity, right after the traffic marker, equivalent to ... ... ... ... ... .... . dong (in words)

- Session 7: Party B to Party A contributes to 5% of the total value of equity, immediately after the procedure to transfer the land use right certificates and land use rights, equivalent to ... ... ... ... ... .... . dong (in words)

Contact Information abcddddddddddddddddddddd

Real Estate Trading Center Phuc Duc
Address: 240 Vo Van Tan St., Ward 5, District 3, Ho Chi Minh City, Vietnam 
Phone: (+84.8) 39293636        Fax: (+84.8) 38329277 
© Contact: Le Van Tham 
Mobile: +84.989 37 37 95 
© Contact: Huynh Ngoc Thien Truong 
Mobile: +84.979 220 212